Recovery of biogas from its waste landfills Biomethane injected into the natural gas distribution network

With WAGABOX® technology, Veolia recovers the methane produced by the degradation of organic waste at landfill sites and injects it directly into the natural gas distribution network.

Main project's drivers for reducing the greenhouse gas (GHG) emissions

noun_Low Fat_3488837Created with Sketch.

Energy and resource efficiency

noun_Ecology_1351672Created with Sketch.

Energy Decarbonisation

noun_Energy Efficiency_1362024Created with Sketch.

Energy efficiency improvements

noun_green energy_1112618Created with Sketch.

Improving efficiency in non-energy resources

noun_absorptive capacity_3636324Created with Sketch.

Emission removal

financement iconCreated with Sketch.

Financing low-carbon issuers or disinvestment from carbon assets

noun_Climate Change_2531889Created with Sketch.

Reduction of other greenhouse gases emission

Project objectives

Recovering the methane produced by the degradation of organic waste at landfills and injecting it directly into the natural gas distribution

Detailed project description

Reducing net CO2 emissions to zero by 2050, as set out in the European framework, requires the implementation of large-scale industrial solutions. The recovery of biogas from landfill waste is one of the key levers of Veolia’s activities to contribute to this objective. This major project in partnership with Waga Energy, a Grenoble-based startup, is an emblematic illustration of this in terms of its size and impact. A true example of industrial and territorial ecology, it will make it possible to produce local, renewable and low-carbon energy.

This innovation offers an energy efficiency three times higher than solutions consisting in burning biogas in an engine or a turbine to produce electricity. Biomethane can also be easily stored and transported using existing gas infrastructures.

By substituting biomethane for natural gas, the WAGABOX® solution avoids the carbon emissions caused by the use of fossil fuels.

Emission scope(s)

on which the project has a significant impact

Scope 1

Direct emissions generated by the company's activity.

Scope 2

Indirect emissions associated with the company's electricity and heat consumption.

Scope 3

Emissions induced (upstream or downstream) by the company's activities, products and/or services in its value chain.

Emission Removal

Carbon sinks creation, (BECCS, CCU/S, …)

Avoided Emissions

Emissions avoided by the activities, products and/or services in charge of the project, or by the financing of emission reduction projects.

Scope 1 – Methane recovery  

  • Quantification : 21,1 kt CO2/year 

Avoided EmissionsSubstitution of natural gas by biomethane

 

  • Quantification : 24 kt CO2/an 

The WAGABOX® solution allows the recovery of 118 182 MWh PCI/year of biomethane. We can consider that this biomethane has an emission factor of 23,4 kgCO2eq/MWh PCI.

The emission factor of natural gas is about 227 kgCO2/MWh PCI. The injection of biomethane into the network, all other things being equal, avoids 203.6 kgCO2/MWh COD, i.e. for this installation more than 24,000 tCO2/year.

On the other hand, if the methane from the decomposition of the waste had not been recovered, its ordinary treatment by combustion would have resulted in the emission of 21,000 tCO2eq (GWP at 100 years = 30). The recovery of methane by the WAGABOX® solution therefore also avoids 21 000 tCO2/year at the non-hazardous waste storage facility.

In total, more than 45 000 tCO2eq/year are avoided by the WAGABOX® solution.

Key points

GroupCreated with Sketch.

Invested amount

Claye-Souilly : 11 M€
Saint-Palais : 3 M€
Le Ham : 3 M€

noun_date_1379066Created with Sketch.

Starting date of the project

November 2018

noun_position_2125941Created with Sketch.

Project localisation

Claye-Souilly (Seine et Marne), Saint Palais (Cher) et Le Ham (Manche).

Project maturity level

Prototype laboratory test (TRL 7)

Real life testing (TRL 7-8)

Pre-commercial prototype (TRL 9)

Small-scale implementation

Medium to large scale implementation

Economic profitability of the project (ROI)

Short term (0-3 years)

Middle term (4-10 years)

Long term (> 10 years)

Illustrations of the project

The project is part of a contribution to various SDGs (Sustainable Development Goals) :

  • In addition to GHGs, this project avoids the emission of other pollutants produced by the combustion of biogas (SDG 7 Clean and Affordable Energy, SDG 9 Industry, Innovation, Infrastructure, and SDG 13 Action on Climate Change).
  • It is a territory-wide industrial ecology project with a partnership approach to accelerate ecological transformation (SDG 11 Sustainable Cities and Communities and SDG 17 Partnerships for Achieving the Goals).

Finally, this project contributes to the creation of qualified industrial jobs in France (SDG 8 Decent work and economic growth).

This type of project is reproducible if the support mechanisms for biomethane injection projects from non-hazardous waste storage facilities are maintained.

A partnership between Veolia and Waga Energy, a young innovative company, has been initiated.