A new recycling center to foster circular economy
Construction of a new aluminum recycling center at our Neuf-Brisach site. It will enable us to produce aluminum sheets and coils for the automotive and packaging markets with more recycled aluminum
The objective is to use the waste heat from our casting furnaces, thanks to the installation of heat capture systems and heat exchangers. This heat recovery will supply part of the city's heating needs via a new network, avoiding the necessary energy consumption (mainly gas).
Constellium has innovated and invested in systems for capturing and filtering the waste from aluminum casting furnaces. These rejects at 500°C allow to heat the city water at 95°C via heat exchangers.
This allows to heat about 45 buildings (hospital, high school, swimming pool, house…) of the city via a network of 11km. Thanks to the installation of a biomass boiler room, the city of Issoire will be heated by more than 90% renewable energy and will save 4,874 tons of CO2 per year for the region, the equivalent of removing 2,700 cars from the road. – An exemplary energy mix with 90% Renewable and Recoverable Energy, broken down into 36% wood energy (biomass) and 54% waste heat recovered from the Constellium industrial plant (+ 10% gas to reach 100% and to respond to peak consumption).
on which the project has a significant impact
Scope 1 – Installation and operation of new equipment.
Avoided emissions : To avoid the CO2 emissions of the city of Issoire thanks to heating provided by our activity.
Quantification : 4874 tCO2eq (Constellium + heating with biomass)
The project’s installations will allow the recovery and injection into the city’s heating network of nearly 25 GWh of heat per year, 54% of which will come from Constellium (13.5 GWh per year). The biomass heating plant will be able to produce 9 GWh/year with an emission factor of 0 gCO2/kWh (if we exclude the road transport of the biomass).
1,3 M€ for the recovery part at Constellium - 14 M€ for the construction of the network + the biomass boiler room (of which 60% subsidy by Ademe and CEE)
2018
Issoir, Puy de Dôme
This is a first step that can be followed by others to increase the city’s heating coverage.
Dalkia, the city of Issoire
Dalkia has signed a 20-year public service delegation agreement with the city of Issoire. Dalkia is responsible for building the network of pipes, constructing the biomass and gas-fired boiler rooms that supplement the 54% of heat recovered from Constellium, connecting subscribers, and operating the service on a daily basis.
As part of the public service delegation, Dalkia finances and bears the commercial risk.
mireille.tournie@constellium.com
Construction of a new aluminum recycling center at our Neuf-Brisach site. It will enable us to produce aluminum sheets and coils for the automotive and packaging markets with more recycled aluminum
AFEP (Association of French large companies) is an association representing 111 of the largest companies operating in France. It participates in the public debate with the ambition to provide pragmatic answers in favour of the development of a competitive and sustainable French and European economy, conducive to the growth of all companies.